Blue Copper Technologies

Legends

Selected parcels
Scenario bundle
Default parcels

Baseline Intelligence

Under Review
Dashboard

Review required before publication

View Mode

Total Parcels

344

1 zone · Howrah-II

Total Area

148.88 ac

Net: 80.61 ac

Financial Exposure

282.44 Cr

Arrears: ₹204.9 Cr

Encroachment

16%

Overlap parcels

Litigation Cases

71

Priority review

Howrah-II

Z-HOWRAH-II · 344 parcels · 148.88 acres gross

Active

213

Inactive

113

Exposure

282.44Cr

Arrears

204.9Cr

Litigation

71

Heritage

0

Howrah-II is an 80.61-acre net lease-spine zone with a strong active industrial/transport base, but with clustered brownfield and frontage pressures that make it ideal for scenario-led packaging. The risk picture is 39 Red, 134 Amber and 171 Green parcels, with 71 parcels carrying litigation signals. Early PPP packages should come from cleaner Sibpur/Cowies Ghat clusters, while Ramkristopur brownfields and the Bengal Flour Mill / Foreshore cluster move through enabling actions before tendering.

Zone Readiness & Risk Indices

Infrastructure Readiness81/100
Market Readiness68/100
Access Quality87/100
Environmental Risk43/100
Encroachment Load16%
Priority Intervention71/100

Indices scaled to /100 · Higher = better except environmental risk, encroachment, and priority intervention

Financial Breakdown

Total Exposure282.44 Cr
Arrears204.9 Cr

Arrears = 73% of total exposure

Land Use Mix

Mixed / unspecified: 36.3%

Transport / ferry: 22.7%

Inactive / legacy: 21.2%

Logistics / storage: 9.0%

Industrial: 4.1%

Parcel Risk Mix

Green (low risk)171
Amber (medium risk)134
Red (high risk)39

Policy Overlay & Regulation Alerts

River-Edge Environmental Controls

Packages touching ferry or foreshore edges require drainage, river-edge and compliance screening before tender.

Encroachment Baseline Required

Field verification must confirm overlap or ring-fence adjacency so hidden possession risk does not transfer into the concession.

Brownfield Liability Allocation

Where structures or legacy industrial surfaces are involved, bid documents must state whether demolition and remediation are Port or concessionaire risks.

Lease & Concession Tenure Discipline

Tenure, reserve logic and competitive allocation must be explicit in the package note and concession schedule per MPAA 2021 + PGLM 2014.